A BadgerCare Plus eligibility renewal letter and a Pre-Printed Renewal Form (PPRF) are generated in the second week of the 11th month of the certification period. Do not schedule a renewal until after adverse action in the month prior to the month of renewal.
| Example 1 | CARES sends out the eligibility renewal letter and PPRF the 2nd week of July for a review due in August. Do not schedule the renewal for a date prior to adverse action in July. |
Do not require a new authorized representative form at renewal if the person signing the renewal is the authorized representative on file. If the renewal is not completed by the end of the certification period, the case will close. The closure notice is generated through CARES, at adverse action in the renewal month.
The member must include a valid signature at the time of renewal. This includes either signing telephonically, signing electronically, or signing in writing one of the following:
With the exception of renewals completed through the administrative renewal process, the signature requirements for renewals are the same as those for applications (see Section 25.5 Valid Signature).
This page last updated in Release Number: 24-03
Release Date: 12/18/2024
Effective Date: 12/18/2024